69.6492° N — Arctic compute
Plan capacity
Signal · N-01 · NarvikHall A · 72% load

Compute, measured in degrees.

GPU halls above the Arctic Circle. Cooled by outside air, powered by rivers, metered to the watt.

Plan capacity
01⁠DataMeasured at the meter
01 / 05
PUE · 20250.00

Power usage effectiveness, metered every hour across Hall A.

Renewable share0.0%

Hydro and wind from the NO4 grid, matched by the hour.

Water used0L

Free-air cooling. No evaporative towers, no chilled water.

Heat reused0GWh

Delivered to Narvik’s district heating network last winter.

Latency to Oslo0.0ms

Two dark-fibre routes south, diverse paths.

02⁠ComputeThree ways to run
01Reserved
01Compute

Reserved

Dedicated H200 and B300 pods from 256 GPUs, on one to three-year terms.

From$1.62/ GPU-hr
Reserve a pod
3.2 Tb/s fabricDeadline creditsNamed engineer
02On-demand
02Compute

On-demand

Spin up 8 to 512 GPUs in minutes. Billed per second, no commitment.

From$2.24/ GPU-hr
Start now
Per-second billing400 Gb/s fabricInstant start
03Sovereign
03Compute

Sovereign

Private halls under EEA jurisdiction for governments and research labs.

PriceCustom
Talk to sales
Own hallCustomer-held keysISO 27001
03⁠Case studiesThe people who moved north
All case studies
Portrait of Amara Okafor
TensorfieldFoundation models
“We trained a 70B model in 19 days and spent a third less on energy. The cold is not a gimmick, it is a cost line.”
Amara OkaforHead of Infrastructure, Tensorfield
−34%
Energy cost
Read case study
Portrait of Jonas Weber
Helix AIBiotech inference
“We moved our protein-folding fleet north without changing a line of code. Latency went up two milliseconds. Nobody noticed.”
Jonas WeberCTO, Helix AI
−61%
CO₂ per query
Read case study
Portrait of Erik Halvorsen
Orbit LabsEarth observation
“A petabyte of satellite imagery a month, and zero litres of water. That number changed how our board talks about compute.”
Erik HalvorsenCFO, Orbit Labs
0 L
Water used
Read case study
04⁠AboutWhy the North

Signed by 34 engineers in Tromsø
05⁠NewsFrom the North
All news
06⁠ContactQ1 2027 allocation is open

Tell us cluster size and start date. An engineer replies within one working day.

Tell us cluster size and start date. An engineer replies within one working day.

Plan capacity
Tromsø HQ—
N-01 Narvik−4 °C · Live
N-02 Kiruna−9 °C · 2027
NO4 price€4.3 / MWh
© 2026 Nordlys AS · Org. 931 204 118All systems normal · build 26.10.05Built in FramerCreated byFlowmance

Create a free website with Framer, the website builder loved by startups, designers and agencies.