69.6492° N — Arctic compute
Plan capacity

← Case studies

/

Foundation models

Tensorfield

A 70B foundation model, trained in 19 days on 2,048 H200s.

Summer heat throttled every run in Frankfurt. In Narvik the cluster has not slowed once, and energy per run fell by a third.

Read the story

Industry

Foundation models

GPUs

2048

Site

N-01

Live since

−34%

Energy cost vs. previous region

19 d

Time to train 70B

−38%

Job restarts

01⁠At a glanceThe run in three lines

Challenge

Summer heat throttled 70B runs in Frankfurt, costing a week per run.

Solution

A dedicated 2,048-GPU pod on its own fabric, racked in 11 days.

Result

19-day training runs, a third less energy, no thermal restarts.

Summer was the bottleneck

Tensorfield trains open-weight foundation models for European enterprises. In 2025 their 70B runs lived in a colocation hall outside Frankfurt, and every July the same thing happened: inlet temperatures climbed, GPUs throttled, and checkpoints were restored two or three times a week.

The team had tuned everything they could control. What they could not control was the air. A run planned for 19 days took 24, and the energy line on each run grew with it.

“We stopped planning around the weather. That alone gave us back a week per run.”

A pod of their own, in Hall A

In January 2026 Tensorfield reserved a Dedicated pod of 2,048 H200s on N-01. The hall is cooled by outside air for all but a few days a year, and powered by hydro from the Narvik grid at a fixed rate for the full term.

Overhead cable trays above the Tensorfield pod

What moved north

  • The full training stack on bare metal, with their own images and Slurm config.

  • 2 PB of checkpoint storage, replicated inside the hall.

  • A dedicated 3.2 Tb/s InfiniBand fabric with no neighbours on the spine.

Six months in

The pod went live on 3 March 2026. Since then Tensorfield has trained two 70B models and one 140B ablation. Energy per run is down 34%, and job restarts are down 38%, almost all of them now caused by code rather than heat. The next run is booked on B300 capacity from Q1 2027.

Tensorfield

Foundation models

Our training runs used to stall on thermal limits every summer. In Narvik they just keep going, and the power bill is one we can plan around.

Amara Okafor

−34%

Energy cost vs. previous region

02⁠ContactQ1 2027 allocation is open

Tell us cluster size and start date. An engineer replies within one working day.

Plan capacity
Tromsø HQ—
N-01 Narvik−4 °C · Live
N-02 Kiruna−9 °C · 2027
NO4 price€4.3 / MWh
© 2026 Nordlys AS · Org. 931 204 118All systems normal · build 26.10.05Built in FramerCreated byFlowmance

Create a free website with Framer, the website builder loved by startups, designers and agencies.