69.6492° N — Arctic compute
Plan capacity
Plan capacity · Q1 2027 allocation open

Cluster size, term and start date are enough. An engineer, not a sales rep, replies within one working day.

First reply1 working day
Pods left Q16 of 14
From$1.46 / GPU-hr
NDABefore the call
01⁠RequestTakes about two minutes

Rough numbers are fine. We size the pod, fabric and power with you on the first call.

A

About you

B

The cluster

C

Timing and workload

We use your details only to reply. No newsletter, no third parties.

02⁠Before you sendCommon questions

Prefer to see the hall first? Tours run every second Tuesday.

Visit Narvik

Cluster size, term and a start quarter are enough to quote. Model size and stack help us plan fabric and storage, but they can wait for the call.

Yes. Mention it in the message and we send our mutual NDA with the first reply, or sign yours. Most are done within two days.

64 GPUs on a shared-spine Pod. Below that we refer you to partners in Oslo and Stockholm who run smaller footprints on our power.

Pods up to 512 GPUs are live in about three days. Dedicated pods are racked and burned in within eleven days of signing. Q1 2027 B300 slots are booked in order of signature.

Tromsø HQ—
N-01 Narvik−4 °C · Live
N-02 Kiruna−9 °C · 2027
NO4 price€4.3 / MWh
© 2026 Nordlys AS · Org. 931 204 118All systems normal · build 26.10.05Built in FramerCreated byFlowmance

Create a free website with Framer, the website builder loved by startups, designers and agencies.