69.6492° N — Arctic compute
Plan capacity

PUE · N-011.08
Hall load72%
Outside air−4 °C
UTC—
01⁠CustomersWho trains in the North
Tensorfield
quorum
Vektor
Helix AI
Kernel
synapse
Orbit Labs
Photon

Training a frontier model now draws as much power as a small city. Up to forty percent of it goes to cooling, in places that are already too hot. We chose a place where the air does that work for free.

Learn more
02⁠2026 onwardsArctic capacityTwo sites, 180 MW by 2028

Fig. 01 — Cold aisle, N-01

68.4385° N · Narvik, Norway

68.4385° N · Narvik, Norway

68.4385° N · Narvik, Norway

Site index

N-01 Narvik

Live

Our first hall sits in a decommissioned mine above the Ofotfjord. Outside air below 10 °C for 300 days a year means no chillers, only fans. Waste heat warms the town's district network.

See site data

Capacity

60 MW IT

GPUs online

24,576 × H200

Interconnect

3.2 Tb/s InfiniBand

Grid

NO4 · 98.7% hydro

Latency to Oslo

9.4 ms

Certification

ISO 27001 · Tier III

Spot power price · NO4 · last 48 h · € / MWhNow €4.3Avg €14.5Peak €27.8
€0€10€20€30avg €14.5−48h−36h−24h−12hNow
03⁠ComputeThree ways to run

Reserved clusters

Dedicated H200 and B300 pods from 256 GPUs, on one-to-three year terms.

From $1.62 / GPU-hr

On-demand

Spin up 8 to 512 GPUs in minutes. Billed per second, no commitment.

From $2.24 / GPU-hr

Sovereign tenancy

Private halls for governments and labs. EEA jurisdiction, your keys, your staff.

By arrangement
05⁠DataMeasured at the meter
Annual PUE1.09

Average power usage effectiveness across 2025, metered hourly.

Renewable share98.7%

Hydro and wind from the NO4 grid, matched by the hour.

Water used0L

Free-air cooling. No evaporative towers, no chilled water loops.

Heat reused41GWh

Delivered to Narvik's district heating network last winter.

++
06⁠TestimonialsVoices from N-01
“We moved pre-training to Narvik in March. Same throughput, and our energy bill fell by a third.”
Amara Okafor, Head of Infrastructure, TensorfieldRecorded in Oslo · Mar 2026
07⁠PricingPer H200 GPU-hour
Term
Explore8 – 512 GPUs
$2.04/ GPU-hr

For research teams, fine-tunes and evaluation runs.

  • Per-second billing
  • Shared 400 Gb/s fabric
  • Checkpoint storage up to 2× model size
  • Email support, next business day
ScaleMost chosen
$1.84/ GPU-hr

Dedicated pods for production training, 256 to 16,384 GPUs.

  • Dedicated 3.2 Tb/s InfiniBand
  • Deadline guarantees with credits
  • Live PUE and carbon reports
  • Named engineer, 4-hour response
SovereignPrivate hall
Custom

Isolated halls under EEA jurisdiction for governments and labs.

  • Dedicated hall and power feed
  • Customer-held keys, on-site staff option
  • ISO 27001 · Tier III
  • 24/7 incident line

Prices exclude VAT. B300 pricing on request. Power and cooling included.

08⁠Plan capacityQ1 2027 allocation is open

Reply within one working day

Cluster size · H200, 1-year term

About $1.38M a month, 565 MWh of hydro power, and 134 t less CO₂ than an average EU site.

An engineer replies within one working day.

Tromsø HQ—
N-01 Narvik−4 °C · Live
N-02 Kiruna−9 °C · 2027
NO4 price€4.3 / MWh
© 2026 Nordlys AS · Org. 931 204 118All systems normal · build 26.10.05Built in FramerCreated byFlowmance

Create a free website with Framer, the website builder loved by startups, designers and agencies.