69.6492° N — Arctic compute
Plan capacity
Customers · 6 teams on N-01

Foundation labs, biotech and public services running in Hall A, Narvik. Their numbers, in their own words.

Browse all six
GPUs live9,984
Energy saved−34% median
Cooling water0 L
SinceMarch 2024
01⁠FeaturedCase of the quarter

One team, picked each quarter from the labs running on N-01.

One team, picked each quarter from the labs running on N-01.

Tensorfield

Foundation models

A 70B foundation model, trained in 19 days on 2,048 H200s.

Summer heat throttled every run in Frankfurt. In Narvik the cluster has not slowed once, and energy per run fell by a third.

Read case study

In their words

Customer since 2024

Our training runs used to stall on thermal limits every summer. In Narvik they just keep going, and the power bill is one we can plan around.

Amara Okafor

Head of Infrastructure

Read case study

→

−34%

Energy cost vs. previous region

19 d

Time to train 70B

−38%

Job restarts

02⁠All case studiesSix teams, one hall

All

Foundation models

Biotech

Climate

Robotics

Public sector

Tensorfield

A 70B foundation model, trained in 19 days on 2,048 H200s.

Foundation models

2,048

GPUs ·

N-01

−34%

Energy cost vs. previous region

→

Helix AI

A protein-folding inference fleet moved north without a code change.

Biotech

512

GPUs ·

N-01

−61%

CO₂ per query

→

Vektor

Ten million simulated robot-hours a week, on a fixed power price.

Robotics

1,024

GPUs ·

N-01

3.1×

Sim throughput

→

Orbit Labs

Petabyte-scale satellite vision for flood and ice models, cooled by the fjord.

Climate

768

GPUs ·

N-01

0 L

Water used for cooling

→

Photon

A multimodal model checkpointed every 20 minutes without a single stall.

Foundation models

1,536

GPUs ·

N-01

11 d

Contract to first job

→

Kernel

A sovereign language model for Nordic public services, kept inside the EEA.

Public sector

4,096

GPUs ·

N-01

100%

Customer-held keys

→

Customer telemetry, Jan – Sep 2026

All sites: N-01 Narvik · N-02 Kiruna from 2027

03⁠ContactQ1 2027 allocation is open

Tell us cluster size and start date. An engineer replies within one working day.

Tell us cluster size and start date. An engineer replies within one working day.

Plan capacity
Tromsø HQ—
N-01 Narvik−4 °C · Live
N-02 Kiruna−9 °C · 2027
NO4 price€4.3 / MWh
© 2026 Nordlys AS · Org. 931 204 118All systems normal · build 26.10.05Built in FramerCreated byFlowmance

Create a free website with Framer, the website builder loved by startups, designers and agencies.