69.6492° N — Arctic compute
Plan capacity

← Case studies

/

Foundation models

Photon

A multimodal model checkpointed every 20 minutes without a single stall.

Photon needed 1,536 GPUs quickly and a storage path that could keep up with frequent checkpoints. Eleven days after signing, the first job was running.

Read the story

Industry

Foundation models

GPUs

1536

Site

N-01

Live since

11 d

Contract to first job

20 min

Checkpoint interval

0

Checkpoint stalls

01⁠At a glanceThe run in three lines

Challenge

A tight training window and checkpoints that paused the cluster for minutes.

Solution

1,536 H200s racked in eleven days, with asynchronous checkpoints to hall-local flash.

Result

Checkpoints every 20 minutes, no stalls, the release shipped on schedule.

A deadline and a storage problem

Photon builds multimodal models that read documents, charts and images together. In spring 2026 the team had a release date, a model design and no cluster large enough to train it in time.

They also had a lesson from their last run: checkpoints that paused the whole job for minutes, so the team saved progress only twice a day and lost hours whenever a node failed.

“We had the model. What we needed was a cluster that was ready when we were.”

Eleven days to first job

Nordlys had H200 capacity on the floor in Hall A. The pod was cabled, burned in and handed over eleven days after signing, with Photon's own images and scheduler config already loaded.

What made checkpoints invisible

  • Shards copied to host memory in seconds, then written in the background.

  • A flash tier inside the hall, on a storage network separate from the compute fabric.

  • Large packed files per node instead of hundreds of thousands of small ones.

The release

Photon trained with a checkpoint every 20 minutes and recorded no checkpoint stalls across the run. Two node failures cost less than half an hour of work in total, and the model shipped on the planned date.

Photon

Foundation models

We signed on a Monday and were training eleven days later. Checkpoints went from something we scheduled around to something we stopped thinking about.

Arjun Desai

11 d

Contract to first job

02⁠ContactQ1 2027 allocation is open

Tell us cluster size and start date. An engineer replies within one working day.

Plan capacity
Tromsø HQ—
N-01 Narvik−4 °C · Live
N-02 Kiruna−9 °C · 2027
NO4 price€4.3 / MWh
© 2026 Nordlys AS · Org. 931 204 118All systems normal · build 26.10.05Built in FramerCreated byFlowmance