69.6492° N — Arctic compute
Plan capacity

←

All field notes

Company

2

min read

B300 pods are now bookable for Q1 2027

The first B300 pods in Hall A go live in Q1 2027. Reservations open today, with fixed hydro rates for the full term.

Lena Berg

Solutions engineer

Hall A, Narvik · 68.4° N

Photo: Nordlys

Filed under

Company

From

Hall A, Narvik

←

All field notes

From today, teams can reserve B300 capacity in Hall A for delivery in Q1 2027. Pods come in blocks of 512 GPUs, up to 4,096 on a single non-blocking fabric.

What you get

  • Bare-metal B300 nodes with direct-to-chip liquid cooling, rejected to outside air through dry coolers.

  • A dedicated InfiniBand fabric per pod, with no neighbours on the spine.

  • Hall-local flash for checkpoints and a fixed hydro power rate for the full term.

How to book

Tell us cluster size, start date and term. A solutions engineer replies within one working day with a draft allocation and a date for a hall visit. Existing H200 customers get first refusal until the end of July.

Field notes · Hall A, Narvik

01⁠More field notesFrom the same hall
All notes

Engineering

Why we cool with air, not water

6

min read

→

Company

Nordlys raises $48M Series A to build N-02 in Kiruna

3

min read

→

Engineering

Checkpointing 1,024 GPUs in under 40 seconds

7

min read

→

02⁠CapacityQ1 2027 allocation is open

Run on Arctic air and hydro from $1.46 per GPU-hour. An engineer replies within one working day.

Plan capacity
Tromsø HQ—
N-01 Narvik−4 °C · Live
N-02 Kiruna−9 °C · 2027
NO4 price€4.3 / MWh
© 2026 Nordlys AS · Org. 931 204 118All systems normal · build 26.10.05Built in FramerCreated byFlowmance

Create a free website with Framer, the website builder loved by startups, designers and agencies.