Arctic Circle
North of this line the sun stays down for weeks each winter and the air stays below 10 °C for most of the year. That is our cooling system.
Eleven days from contract to a cluster running your code. Every step is metered.
Tell us cluster size, GPU type and start date. You get a fixed quote with power, cooling and fabric included.
Pods are allocated in Hall A and burned in for 72 hours before your first job touches them.
Jobs land on a dedicated 3.2 Tb/s fabric. Checkpoints stay in-hall, two milliseconds from your GPUs.
Every hour of compute comes with metered energy, carbon and water figures you can hand to an auditor.
North of this line the sun stays down for weeks each winter and the air stays below 10 °C for most of the year. That is our cooling system.
A 120 MW campus on the SE1 grid, built next to a hydro plant. First jobs land in Q3 2027.
Our first hall, inside a former iron-ore mine above the Ofotfjord. Waste heat warms the town.
Engineering and the 24/7 operations room. Every hall is watched from here, two hours' drive from the nearest rack.
“We moved pre-training to Narvik in March. Same throughput, and our energy bill fell by a third. The board noticed before we told them.”
| Hardware | On-demand | 1-year term | 3-year term |
|---|---|---|---|
| H200 SXM141 GB HBM3e | $2.24/hr | $1.84/hr | $1.62/hr |
| B300288 GB HBM3e | $2.98/hr | $2.61/hr | $2.34/hr |
| Sovereign hallPrivate · EEA | — | Custom | Custom |
Prices in USD, excluding VAT. Volume pricing from 4,096 GPUs.